
Under Construction. Plans Approved for 2nd Story bringing total square footage to 35,880. Currently in Vanilla Shell Condition with ceiling clearance ranging from 28 feet at peak to 22 feet at walls. Three roll up doors; four walk in doors. Current Floor Plans are for Cannabis Grow Operation with elevator to second floor. Plans already approved. Slab was already designed for 2nd floor with bolts already in place. Edison connection coming soon along with SoCal Gas for natural-gas generators if needed. Water and sewer are available in paved street. See attached floor plans, and modify if desired. Building contractor ready to complete the construction.

ray@millmanteam.com
ray@millmanteam.com